Data

Units of measurement — which measurement system will be used in the program
Order numbering
Next order number — number that will be automatically assigned when creating a new order.
Next order number (Calculation) — separate counter for new calculation numbers (if the setting Don't assign order number for "Calculation" status is enabled).
Next order number for dealers — includes separate number counter for dealer orders.
Save order number when opening file — order will load with the number it was saved with in the file.
Support Russian letters in barcode — support for reading Cyrillic characters when generating barcode (if such characters are present in the order number).
One barcode in calculation (all ceilings in order) — generate a single code for the entire order, not for each canvas.
Print database prefix in barcode — add database identifier to barcode for uniqueness (for working with the "Multiple network databases" function).
Display installation address instead of customer address in order list — show installation address in the orders table.
Display installation address instead of customer address in customer calculation — display installation address in customer calculation form.
Order numbering method
Sequential numbering (1,2,3,…) — simple sequential numbering without prefixes.
Dealer nickname + his order number (Nick-1, Nick-2,…) — dealer login comes at the beginning of the number, then sequential number, individual for each dealer.
Sequential numbering – batch (1,2,3-5,6-…) — grouping orders into batches when issuing numbers. Each ceiling is assigned an individual number.
Department prefix + sequential numbering (A-1,B-2,A-3) — department code is placed at the beginning of the number.
Change language / Change the language
Dropdown list for selecting interface language (e.g., Russian or English).
Colors for order statuses — for each status in the order list, you can set the row background color:
Other options
Don't assign order number for "Calculation" status — order is created with "calculation" status, and sequential number is assigned only after transitioning to new status. For more details, see the article "Statuses".
Prohibit editing ceilings in "In progress" status and below — blocks changes to drawings and calculations after entering work.
Show only orders of current Manager and Department — filter list by responsible manager and department.
Show only Dealers assigned to current Manager — only dealers linked to you are displayed in the dealer list.
Edit calculation with "In progress" status — allows making changes to calculation after starting work.
Force warehouse selection when writing off — always request warehouse selection when writing off materials.
Don't save ceiling thumbnails to database — saves space in database. But ceiling previews in order information are less detailed.
Store ceiling change history — maintains table of ceiling changes. For more details, see the article "History of ceiling changes".
Pre-cache files for export to 1C — speeds up data export to 1C through preliminary preparation. Required when using export to 1C:SmartCeiling when working via RDP.