📟 Production scoreboard - Statistics

It is designed to display up-to-date production statistics in real time.

Basic interface elements

Top panel

  • Current time - displays the current time in HH format:MM

  • Deadline - shows the nearest active deadline.

Bottom panel

  • The plan is the total number of ceilings planned for production. The calculation includes ceilings that are in the "In production" or "Ready" status, linked to active shipping points (configured in the production board), with a shipping date for the current day, taking into account the time limits of the deadline (if any).

  • Done - the number of ceilings that have passed the production cycle. Ceilings that have undergone the "harpoon" operation (marked in the production log) or have been shipped are taken into account.

  • The remainder is the number of items remaining to be completed.

Progress Bar

  • Visual display of plan execution

  • Number of remaining items

Color indication

  • Current time: blue background with blue text

  • Deadline:

    • Green background - the deadline is fulfilled on time

    • Red background - the deadline is overdue

Settings Window

  • A deadline is a time limit for completing a production plan for the current day.

  • A shipping point is a location or division through which finished products are shipped.

Transactions with deadlines

  1. Adding a new deadline:

    • Click the add button

    • Enter the name of the deadline

    • Specify the time in the HH format:MM (for example, 2:30 p.m.)

    • Click "Add"

  2. Deadline Editing:

    • Select a deadline in the table

    • Click the edit button

    • Change the name or time

    • Click "Apply"

  3. Removing the deadline:

    • Select a deadline in the table

    • Click the delete button

    • The deadline will be marked for deletion.

  4. Activating/deactivating the deadline:

    • Check/uncheck the box in the "Active" column

List of shipping points

  • Displays all available shipping points

  • Each point has an activity flag.

  • Select All checkbox for mass management

Main settings buttons

Saving changes:

  • Click the "Save Settings" button

  • All changes will be applied to the database.

  • A message about successful saving will appear.

Undo changes:

  • Click the "Undo changes" button

  • All settings will return to the state from the database.

Other settings

  1. The mode of operation of the production board. Switch between production display modes